16:59 01.03.2013

Construction of bridge in Sevastopol to be completed in April

1 min read

The construction of a road bridge near the railway station in Sevastopol is to be completed in April this year, the Ministry of Infrastructure of Ukraine said on Friday.

The new bridge will be the main transport connection between the Leninsky and Nakhimovsky districts.

According to the design, the length of the bridge will be 600 meters, and the width of the roadway with sidewalks - 15 meters.

The estimated cost of the work is UAH 69.6 million.

AD
AD
AD
AD